Advanced Search

JIA Huan, HE Yuan, YUAN Youjin, YUAN Chenzhang, ZHANG Peng, HAN Shaofei. Design and Setup of 5 MeV HEBT Line of the CIADS Injector Scheme II[J]. Nuclear Physics Review, 2016, 33(3): 286-290. doi: 10.11804/NuclPhysRev.33.03.286
Citation: JIA Huan, HE Yuan, YUAN Youjin, YUAN Chenzhang, ZHANG Peng, HAN Shaofei. Design and Setup of 5 MeV HEBT Line of the CIADS Injector Scheme II[J]. Nuclear Physics Review, 2016, 33(3): 286-290. doi: 10.11804/NuclPhysRev.33.03.286

Design and Setup of 5 MeV HEBT Line of the CIADS Injector Scheme II

doi: 10.11804/NuclPhysRev.33.03.286
Funds:  Strategic Priority Research of Chinese Academy of Sciences Program(XDA03020000), National Natural Science Foundation of China (91426303)
  • Received Date: 2015-10-21
  • Rev Recd Date: 2015-12-11
  • Publish Date: 2016-09-20
  • A CW 10 mA,5 MeV beam commissioning of CADS Injector Ⅱ is planed recently to test the high power superconduction linac techniques.To transport 50 kW beam from linac to the beam dump,a high energy beam line (HEBT) line is designed and setup.Two Triplet are used to control the beam size along HEBT and at the beam dump.One diagnostics box is used for horizontal and vertical emittance measurement.To avoid damages to the vacuum pipe,beam should be transported to the beam dump without losses.The details of the HEBT design will be described in the paper.
  • [1] WANG Zhijun,HE Yuan,LIU Yong,et al,Chinese Physics C,2012,36(3):256.
    [2] Lu Borui.Thermal Analysis of Fluid-Solid Coupled Heat Transfer For Beam Stop And FFC[D].Master Thesis.Lanzhou:Institute of Modern Physics,Chinese Academy of Sciences,2014.(in Chinese)(鲁博瑞.Beam Stop和FFC的耦合传热分析[D].兰州:中国科学院近代物理研究所.2014.)
    [3] WU S C,HSIUNG G Y.Competition Effects in ProtonInduced Reaction on 65Cu.Chinese Journal of Physics.1986,24(3):204.
    [4] Atomic Data and Nuclear Data Tables.1972,11,165.
  • 加载中
通讯作者: 陈斌, bchen63@163.com
  • 1. 

    沈阳化工大学材料科学与工程学院 沈阳 110142

  1. 本站搜索
  2. 百度学术搜索
  3. 万方数据库搜索
  4. CNKI搜索

Article Metrics

Article views(1143) PDF downloads(141) Cited by()

Proportional views

Design and Setup of 5 MeV HEBT Line of the CIADS Injector Scheme II

doi: 10.11804/NuclPhysRev.33.03.286
Funds:  Strategic Priority Research of Chinese Academy of Sciences Program(XDA03020000), National Natural Science Foundation of China (91426303)

Abstract: A CW 10 mA,5 MeV beam commissioning of CADS Injector Ⅱ is planed recently to test the high power superconduction linac techniques.To transport 50 kW beam from linac to the beam dump,a high energy beam line (HEBT) line is designed and setup.Two Triplet are used to control the beam size along HEBT and at the beam dump.One diagnostics box is used for horizontal and vertical emittance measurement.To avoid damages to the vacuum pipe,beam should be transported to the beam dump without losses.The details of the HEBT design will be described in the paper.

JIA Huan, HE Yuan, YUAN Youjin, YUAN Chenzhang, ZHANG Peng, HAN Shaofei. Design and Setup of 5 MeV HEBT Line of the CIADS Injector Scheme II[J]. Nuclear Physics Review, 2016, 33(3): 286-290. doi: 10.11804/NuclPhysRev.33.03.286
Citation: JIA Huan, HE Yuan, YUAN Youjin, YUAN Chenzhang, ZHANG Peng, HAN Shaofei. Design and Setup of 5 MeV HEBT Line of the CIADS Injector Scheme II[J]. Nuclear Physics Review, 2016, 33(3): 286-290. doi: 10.11804/NuclPhysRev.33.03.286
Reference (4)

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return